Transforming visions into reality with precision and expertise
| S/N | Description | Before | After | Client Demand | Solution | Duration |
|---|---|---|---|---|---|---|
| 1 |
Earthing Reactivation and Earth Pit Maintenance System
Earth pit installed with a 3-inch PVC pipe to facilitate future maintenance of the electrode and ensure low resistance during dry seasons
|
|
|
The client requested the installation of an earthing system to protect office laptops and equipment from damage caused by frequent power surges | Measured Resistance of 0.20 Ω | 5 Days |
| 2 |
The Repair of static earthing monitor
Need it fixed for it can no longer Prevent Fires and Explosions
|
|
|
To Avoid Costly Production Stoppages | Got it fixed and also read the resistance of the static earthing monitor | 1 Day |
| 3 |
Earth Bonding Bar
Complete installation of Earth Bonding Bar, securely connected to the main earthing system for effective grounding and fault protection
|
|
|
Reqires the installation of earthing fot all terminal points | Connected to the main earth terminal (incoming earth from the supply) the earth conductors of individual circuits (lighting, sockets, etc.) | 3 Days |
| 4 |
Fabrication/Installation of 400Amps LT Control
Control and distribute electrical power to multiple loads (motors, pumps, air handlers, or lighting circuits).
|
|
|
Expand existing mall with minimal disruption to current tenants | Strategic phasing, temporary access routes, noise control measures, extended hours | 2 weeks |
| 5 |
250Amps LT Control Panel
Fabricated for the distribution of electrical power to eight semi-detached houses
|
|
|
To Fabricate a 250 Amps Low Tension Electrical Panel for a block of 8 Semi-Detached Houses | Fabricated the 250 Amps LT Panel with the provision of earthing Tab | 2 Weeks | 6 |
OXYGEN ANALYZER CABINETS FOR POWER STATION
Fabricate 6OXYGEN ANALYZER CABINETS FOR POWER STATION .
|
|
|
To fabricate exactly the same type of OXYGEN ANALYZER CABINETS FOR the POWER STATION | Fabricated the 6 NOS of the OXYGEN ANALYZER CABINETS FOR POWER STATION | 8 weeks | 7 |
The Installation of RCBO
Tne Installation of MCB-RCD-RCBO.
|
|
|
To install a Residual Current Breaker with Overcurrent in the Distribution Board | Instaled, Tested and Confirmed Working | One Day | 8 |
Installed 4 NOS Ceiling Cassette Air Conditioner (Indoor Unit),Recessed LED Panel Light, and Outdoor Air Conditioner Units (Condensing Units).
Control and distribute electrical power to multiple loads (motors, pumps, air handlers, or lighting circuits).
|
|
|
A reliable and efficient air-conditioning system to provide uniform cooling for a commercial interior space | Installed Ceiling Cassette Air Conditioner Units, Mounted Outdoor Condensing Units,Recessed LED Panel Lights, System charged, tested, and balanced for optimal cooling performance | 4 weeks | 9 |
Three-Phase 11kV/415V Oil-Immersed Distribution Transformer (Under Maintenance)
The transformer has remained idle for the past five months, resulting in a complete power outage to the filling station
|
|
|
The client requested maintenance or refurbishment of the distribution transformer | The transformer will be fully serviced and tested to restore its functionality after five months of inactivity. Once reinstalled and energized, it will resume stable power supply to the filling station safely and efficiently | 4 weeks |
Get a free, no-obligation quote for your construction project. Our experts will review your requirements and provide a detailed estimate.
Get Your Free Quote Now"Top-quality electrical upgrade. Professional service and precise power distribution work."
Excellent electrical installation — neat, safe, and reliable. Shacteract Contractor exceeded expectations"
"Top-quality electrical upgrade. Professional service and precise power distribution work"